Elevators

Elevators to safely reach the top of the skyscraper

[table caption=”Elevators” width=”1000″ colwidth=”200|300|200|200|400″ colalign=”left|left|left|left|right”]
CLIENT,Location,Title,Technical Data,Year of completion
Thyssen Russia,Moscow Russia, Lot 2/3 Tower City Palace, Installation of 10 lifting devices incl. TWIN-Technology 5 x Twin-Lifting: 1650 kg FH 112.30 m; 5 x Twin-Lifting: 1650 kg FH 202.30 m, Mech. & electr. installation of EM powered lifting devices; Work in progress. 2013

Thyssen Elevators Saudi (Rudis Middle East),Riyadh Kingdom of Saudi Arabia,CMA Tower, Installation of 6 lifting devices incl. TWIN-Technology; 6 x Twin-Lifting: 1650 kg; FH 180 m,Mech. & electr. installation of EM powered lifting devices; Work in progress. 2013

Thyssen Russia,Moscow Russia, Lot 14 Tower Mercury,Installation of 9 lifting devices incl. TWIN-Technology; 4x Twin-Lifting: 1600 kg FH 117 m; SINGLE- Technology; 2x lifting device: 1600 kg; FH 117 m; 1x lifting device: 2000 kg; FH 302 m; 1x lifting device: 1250 kg; FH 248 m; 2x lifting device: 1250 kg; FH 293 m,Mech. & electr. installation of EM powered lifting devices; Work in progress. 2013

Thyssen Aufzuge Sud GmbH Munich Germany,Munich Germany, Skyline Office Munich Germany,Installation of 19 lifting devices 4 x lifting device: 1600 kg; FH 78m; 1x lifting device: 1050 kg; FH 85m 14 x BC61 lifting devices; 1m/s, Mech. & electr. installation of EM powered lifting devices; Work completed. 2010

ThyssenKrupp Liften BV 2921 Krimpen aan den Ijssel, Utrecht Holland, RABO Bank Utrecht Holland,Installation of 13 lifting devices incl. TWIN-Technology; 8 x Twin-Lifting: 1250 kg; FH 90m 2 x fireman lifting device; 2500 kg; 2 x Evolution lifting device: 1250 kg; 1 x Evolution lifting device: 3000 kg,Mech. & electr. installation of EM powered lifting devices; as well the installation of the TWIN-Lifting devices Works completed. 2010

Thyssen Aufzuge Sud GmbH Munich Germany,Dusseldorf Germany, SKY – OFFICE Kennedydamm 24 Dusseldorf, Installation of 15 lifting devices incl. TWIN-Technology; 1x6th group: 1600kg/ 4m/s; 2x Twin-lifting devices: 1x2nd group: 1600kg; 1m/s; 1x3rd group: 675 kg; 1m/s; 1x2nd group: 1450kg; 2.5m/s,Mech. & electr. installation of EM powered lifting devices; as well the installation of the TWIN-Lifting devices Works completed. 2009

Lodige Forder – Technik GmbH Germany Thyssen Aufzuge Sud GmbH Munich Germany,Stuttgart Feihingen Munich Germany, AUDI – Zentrum Stuttgart MAN – Headquarters buiilding in Munich,Installation of 2 CAR-Lifting devices 2 x 4750 kg/ 0.5m/s= 19.5m h Installation of 5 lifting devices 1x2nd group=glass cabins 1000 kg/1 m/s=22.5 m 1x2nd group=1000 kg/1 m/s=22.5 m 1×1275 kg/ 0.42 m/s/h=3.5 m,Mech. & electr. installation of EM powered lifting devices. Works completed. 2009

Thyssen Aufzuge Sud GmbH Munich Germany,Munich Germany,Arabella Sheraton Hotel Munic Arabella Haus D, Modernization of 5 firemans lifting devices; 1×450 kg/ 1.0 m/s/h=3.65 m; 1×450 kg/ 1.0 m/s/h=3.65 m,Demounting of old lifting devices & new mech. & electr. installation of EM powered lifting devices with Synergy technology. Works completed. 2007

Thyssen Aufzuge GmbH Wienna Austria, Linz Austria. TERMINAL Tower Linz,Installation of 4 lifting devices 4×1250 kg/3.5 m/s=90.58 m,Mech. & electr. installation of EM powered lifting devices. Works completed. 2007

Thyssen Aufzuge Sud GmbH Munich Germany,Munich Germany,Suddeutscher Verlag, Installation of 18 lifting devices 2x3rd group= 1275 kg/5.0 m/s =92.59 m – 96.09 m; 1×1275 kg/3.5 m/s=105.84 m (FW); 2x2nd group=2000 kg/1.6 m/s=18.98 m; 1x2nd group=2000 kg/1.6 m/s=9.75 m; 1x2nd group=2000 kg/1.0 m/s=3.85 kg; 1×1300 kg/1.6 m/s=28.73 m; 1×1000 kg/1.00 m/s=4.23 m; 1×900 kg/1.0 m/s=3.85 m,Mech. & electr. installation of EM powered lifting devices. Works completed. 2008

ZAO MIRAX – CITY Moscow Russia, Moscow Russia, Federation Tower Turm A,Installation of 12 lifting devices; 7×1600 kg/6.0/4.0 m/s=125.90/124.90 m; 4×1600 kg/7.0/6.0 m/s=175.80/174.80 m; 1×1600 kg/7.0 m/s=175.80 m,Mech. & electr. installation of EM powered lifting devices. 11 lifting devices are the “Twin-elevators”. Works completed. 2010

ZAO MIRAX – CITY Moscow Russia, Moscow Russia, Federation Tower Turm B,Installation of 17 lifting devices; 6×1600 kg/ 6.0/4.0 m/s/h=124.90 m; 5×1600 kg/ 7.0/6.0 m/s/h=170.40 m; 1×1425 kg/ 7.0 m/s/h=221.90 m; 3×1425 kg/ 7.0 m/s/h=212.60 m; 1×2150 kg/ 4.0 m/s/h=228.20 m; 1×4000 kg/ 4.0 m/s/h=228.20 m, Mech. & electr. installation of EM powered lifting devices. 11 lifting devices are the “Twin-elevators”. Works completed. 2008

OTIS GmbH & Co. KG Munchen Sud Munich,Munich Germany,Technologie Zentrum Neutraubling / Regensburg, Installation of 11 lifting devices; 3×630 kg/ 1.6 m/s/h=10.19 m; 3×800 kg/ 1.6 m/s/h=24.60 m; 1×1000 kg/ 1.6 m/s/h=10.17 m; 1×1000 kg/ 1.6 m/s/h=10.17 m; 1×1000 kg/ 1.6 m/s/h=24.60 m; 1×800 kg/ 1.6 m/s/h=24.60 m; 1×800 kg/ 1.6 m/s/h=24.60 m,Mech. & electr. installation of EM powered of lifting devices GEN 2. Works completed. 2007

OTIS GmbH & Co. KG Munchen Sud Munich,Munich Germany,Saargemunderstr. Munich,Installation of 5 lifting devices; 5×680 kg/ 1.0 m/s/h=15.59 m,Mech. & electr. installation of EM powered of lifting devices GEN 2.  Works completed. 2007

Thyssen Aufzuge West GmbH Dusseldorf Germany,Dusseldorf Germany,Hellweg / Porschestrasse,Installation of 10 lifting devices; 3×630 kg/ 1.0 m/s/h=10.70 m; 3×630 kg/ 1.0 m/s/h=10.69 m; 4×630 kg 1.0 m/s/h=10.77 m bzw. 10.68 m,Mech. & electr. installation of EM powered new lifting devices. Lifting devices are “SPIRIT elevators”; the new standard in lifts; no shaft pit and no headroom. Works completed. 2007

Thyssen Aufzuge Nordost GmbH Hamburg Germany,Hamburg Germany,Messe Hamburg,Installation of 4 lifting devices; 1×1050 kg/ 1.0 m/s/h=14.66 m; 1×1050 kg/ 1.0 m/s/h=16.08 m; 1×1050 kg/ 1.0 m/s/h=12.33 m; 1×1000 kg/ 1.0 m/s/h=7.50 m,Mech. & electr. installation of EM powered new lifting devices.   Works completed. 2007

Thyssen Aufzuge Nordost GmbH Hamburg Germany,Hamburg Germany,CCH Erweiterung Messe MuVa, Installation of 4 lifting devices; 1×5500 kg/ 0.8 m/s/h=16.40 m; 1×1350 kg/ 1.0 m/s/h=17.70 m; 1×5500 kg/ 0.48 m/s/h=5.60 m; 1×5500 kg/ 0.48 m/s/h=5.60 m,Mech. & electr. installation of EM powered new lifting devices (including glass type).  Works completed. 2007

[/table]